The numerous services offered each presented different loading and usage profiles, and different air conditioning needs.
The rooms in the hotel have a fairly stable average occupancy rate compared to the Suites and Conference Center rooms, which are used on and off. Certainly, the common needs were to maintain the comfort required by the prestige of the building, the integration of the systems in the innovative architecture, as well as limiting internal and outdoor noise emissions.
Another non-negotiable objective the customer had was cost optimization in installing and managing such an ambitious and highly visible structure.
During the first technical surveys, the presence of an underground fresh water spring was found. In the past it had been used for the neighbouring industrial utilities, but at that time it was no longer in use.
The building
- 3 structures: hotel, residence, and conference centre
- Total Volume 80,000 m3
- 384 rooms and 1,000 seat conference centre
The team
- Architectural project: DHK Architects, South Africa
- Structural project: Favero & Milan Ingegneria, Italy
- Mechanical plant project: Studio T.I., Italy