The main objective for the client was to limit energy consumption and eliminate emissions polluting the internal controlled areas. We also wanted to take advantage of the opportunity offered by the city groundwater, which run at a depth of 35 meters with a temperature almost constant during the year, which varies between 12 and 14 degrees centigrade.The property wanted a building that offered maximum comfort not only in terms of temperature and humidity, but also in air quality, while containing management costs. The entire design and construction had to take place in a 'green' perspective, in line with the strict requirements of the LEED Core & Shell protocol.The client also wanted to offer users maximum comfort and maximum autonomy, freedom and flexibility of use. Great importance was given to the flexibility of the systems and structures so that they could be adapted to possible future layout modifications to the needs of the tenants.
The building
6500 mq offices on 7 floors above ground, 1165 mq facade around the internal courtyard, 95% recycling of waste produced by the building.
The team
- Client: Kryalos SGR S.p.A. Fund PACIFIC 1
- Project management: MCM S.r.l.
- Sustainability coordinator: Tekser S.r.l
- Architectural design: Asti Architetti S.r.l.
- Structures project: CeAS S.r.l.
- Design of mechanical systems: Tekser S.r.l.